Linear Programming: Shadow Prices and Simplex Principles
Calculating shadow prices (dual values) for binding constraints, determining the range of validity, interpreting non-binding constraints, and understanding the simplex algorithm principles.
Study Text & Technical Notes
Topic Overview & Scope
Calculating shadow prices (dual values) for binding constraints, determining the range of validity, interpreting non-binding constraints, and understanding the simplex algorithm principles.
Essential Examinable Concepts
Key principles and theoretical foundations tested in this topic.
Shadow Price (Dual Value) Definition
The increase in total contribution that would be achieved if one additional unit of a limited (binding) resource were made available at standard cost.
Shadow Price Calculation Method
Step 1: Increase the binding resource constraint rhs by 1 unit. Step 2: Solve the simultaneous equations with the other binding constraint to find the new optimal (x, y). Step 3: Calculate the new total contribution. Ste...
Maximum Overtime Premium Payable
The maximum premium above the standard rate a business should pay to secure an additional unit of a constrained resource is exactly equal to its shadow price.
Shadow Price of a Non-Binding Constraint
The shadow price of any non-binding constraint is ALWAYS $0. Because unused slack capacity already exists, adding more of an unused resource generates zero additional contribution.
ACCA Examiner Tips & Common Pitfalls
In ACCA PM examinations, questions testing Linear Programming: Shadow Prices and Simplex Principles require candidates to look beyond rote definitions and demonstrate applied critical reasoning. Common student pitfalls include confusing legal form with economic substance, omitting mandatory disclosure steps, and failing to justify calculations with standard references.
Topic Mastery Checklist
- Master core definitions and scope boundaries for Linear Programming: Shadow Prices and Simplex Principles
- Memorize key computational workings, journal entries, or audit test procedures
- Be able to critique real-world scenarios against relevant professional standards
- Practice time-pressured CBE questions under 1.8 minutes per mark
Practice questions
Authentic CBE practice questions — work through them step-by-step or view the complete bank.
An optimal plan of x = 40 and y = 30 yields total contribution of $2,300, determined by binding constraints: (1) Labour: 2x + 3y = 170 hours (2) Machine: 4x + 2y = 220 hours Contribution is C = 20x + 50y. If labour capacity is increased by 1 hour to 171 hours, the new solution is x = 39.5 and y = 30.67. What is the shadow price of labour?
Show answer and explanation
Answer: $23.50 per hour
New contribution = 20(39.5) + 50(30.67) = 790 + 1,533.50 = $2,323.50. Original contribution = $2,300.00. Shadow price of labour = $2,323.50 - $2,300.00 = $23.50 per hour.
Common traps: Option 4 subtracts 20 from 23.50. Option 1 correctly calculates the difference between new and original contribution.
Sources: ACCA PM Technical Article: 'Shadow Prices'; ACCA PM Syllabus B1(c)
Exam traps for this topic
All PM exam tipsFlashcards & Key Terms
Active recall with 3D interactive flip deck or full term list.
All PM chapters
- 1. Activity-Based Costing (ABC)
- 2. Target Costing
- 3. Life-Cycle Costing
- 4. Throughput Accounting and Theory of Constraints
- 5. Environmental Management Accounting (EMA)
- 6. Limiting Factor Analysis
- 7. Linear Programming: Graphical Method
- 8. Linear Programming: Shadow Prices and Simplex Principles
- 9. Pricing Decisions
- 10. Make-or-Buy and Outsourcing Decisions
- 11. Shutdown and Discontinuation Decisions
- 12. Decision-Making under Risk and Uncertainty
- 13. Budgetary Systems and Motivation
- 14. Types of Budgetary Systems
- 15. Quantitative Forecasting and Learning Curves
- 16. Basic Variances Revisited
- 17. Material Mix and Yield Variances
- 18. Sales Mix and Quantity Variances
- 19. Planning and Operational Variances
- 20. Performance Management Information Systems
- 21. Financial Performance Measures
- 22. Non-Financial Performance and Divisional Control
Choosing a qualification? CPA vs ACCA 2026