PrepGears
PM · Chapter 7

Linear Programming: Graphical Method

Formulating multi-constraint linear programmes, plotting constraint boundaries, defining the feasible region, applying the iso-contribution line and corner point methods, and identifying slack and surplus.

Syllabus & Core Theory

Study Text & Technical Notes

Chapter 7 Notes

Topic Overview & Scope

Formulating multi-constraint linear programmes, plotting constraint boundaries, defining the feasible region, applying the iso-contribution line and corner point methods, and identifying slack and surplus.

Key Standards / Regulations:
ACCA PM Study Hub SpecificationKaplan & BPP PM Study Text

Essential Examinable Concepts

Key principles and theoretical foundations tested in this topic.

1

Linear Programming (LP) Assumptions

Key assumptions: (1) Linearity of objective function and constraints; (2) Proportionality (constant returns to scale); (3) Additivity (no interaction effects); (4) Divisibility (continuous variables); (5) Certainty of co...

2

Feasible Region (Polygon)

The geometric area on a 2D graph bounded by all constraint inequalities and the non-negativity axes (x >= 0, y >= 0). Any coordinate within or on the boundary of this convex polygon satisfies all operational constraints ...

3

Objective Function

An algebraic equation defining the management goal to be optimised, typically maximising total contribution: Maximise C = c1*x + c2*y, subject to linear resource constraints.

4

Iso-Contribution Line Method

A straight line representing all combinations of x and y yielding a constant contribution (e.g. c1*x + c2*y = k). The line is moved parallel away from the origin; the last vertex of the feasible region it touches before ...

ACCA Examiner Tips & Common Pitfalls

In ACCA PM examinations, questions testing Linear Programming: Graphical Method require candidates to look beyond rote definitions and demonstrate applied critical reasoning. Common student pitfalls include confusing legal form with economic substance, omitting mandatory disclosure steps, and failing to justify calculations with standard references.

Topic Mastery Checklist

  • Master core definitions and scope boundaries for Linear Programming: Graphical Method
  • Memorize key computational workings, journal entries, or audit test procedures
  • Be able to critique real-world scenarios against relevant professional standards
  • Practice time-pressured CBE questions under 1.8 minutes per mark

Practice questions

Authentic CBE practice questions — work through them step-by-step or view the complete bank.

10 Practice Questions
Question 1of 10
Single choice · 2 marks

Solaris Ltd manufactures two products, X and Y. Each unit of X requires 4 kg of material and 2 hours of labour. Each unit of Y requires 5 kg of material and 6 hours of labour. In the next period, material is limited to 1,000 kg and labour is limited to 720 hours. Which set of inequalities correctly models the resource constraints?

Show answer and explanation

Answer: 4x + 5y <= 1,000; 2x + 6y <= 720; x >= 0, y >= 0

Total material consumed = 4x + 5y, which cannot exceed available material of 1,000 kg (4x + 5y <= 1,000). Total labour hours consumed = 2x + 6y, which cannot exceed 720 hours (2x + 6y <= 720). Production cannot be negative (x >= 0, y >= 0).

Common traps: Option 2 incorrectly groups inputs by product rather than by resource, putting labour coefficients into the material inequality.

Sources: ACCA PM Study Text Chapter 7; ACCA PM Syllabus B1(b)

Exam traps for this topic

All PM exam tips

Flashcards & Key Terms

Active recall with 3D interactive flip deck or full term list.

20 Key Terms & Definitions
Progress
Card 1 of 20
Mastered
0
Mastery
0%

All PM chapters

  1. 1. Activity-Based Costing (ABC)
  2. 2. Target Costing
  3. 3. Life-Cycle Costing
  4. 4. Throughput Accounting and Theory of Constraints
  5. 5. Environmental Management Accounting (EMA)
  6. 6. Limiting Factor Analysis
  7. 7. Linear Programming: Graphical Method
  8. 8. Linear Programming: Shadow Prices and Simplex Principles
  9. 9. Pricing Decisions
  10. 10. Make-or-Buy and Outsourcing Decisions
  11. 11. Shutdown and Discontinuation Decisions
  12. 12. Decision-Making under Risk and Uncertainty
  13. 13. Budgetary Systems and Motivation
  14. 14. Types of Budgetary Systems
  15. 15. Quantitative Forecasting and Learning Curves
  16. 16. Basic Variances Revisited
  17. 17. Material Mix and Yield Variances
  18. 18. Sales Mix and Quantity Variances
  19. 19. Planning and Operational Variances
  20. 20. Performance Management Information Systems
  21. 21. Financial Performance Measures
  22. 22. Non-Financial Performance and Divisional Control

Choosing a qualification? CPA vs ACCA 2026