PrepGears
SBR · Chapter 4

Property, Plant & Equipment and Borrowing Costs

Explores complex recognition and measurement issues under IAS 16 (cost vs revaluation model, component depreciation, dismantling provisions, spare parts), capitalization of borrowing costs on qualifying assets under IAS 23 (commencement, suspension, cessation), and accounting for government grants under IAS 20.

Syllabus & Core Theory

Study Text & Technical Notes

Chapter 4 Notes

Topic Overview & Scope

Explores complex recognition and measurement issues under IAS 16 (cost vs revaluation model, component depreciation, dismantling provisions, spare parts), capitalization of borrowing costs on qualifying assets under IAS 23 (commencement, suspension, cessation), and accounting for government grants under IAS 20.

Key Standards / Regulations:
IAS 16IAS 23IAS 20IAS 37

Essential Examinable Concepts

Key principles and theoretical foundations tested in this topic.

1

Initial Cost Elements of PPE (IAS 16)

Cost includes: (1) Purchase price less trade discounts; (2) Directly attributable costs to bring asset to location and condition for intended use (site prep, installation, initial testing less net testing proceeds); and ...

2

Revaluation Model & Revaluation Surplus (IAS 16)

If revaluation model is chosen, revaluations must be kept sufficiently regular. Upward revaluations are credited to Revaluation Surplus in OCI. If reversing a previous revaluation deficit expensed in P/L, the increase is...

3

Component Depreciation & Major Inspections

Each part of an item of PPE with a cost that is significant in relation to the total cost of the item must be depreciated separately (e.g. aircraft fuselage vs jet engines). Costs of major regular overhauls or inspection...

4

Borrowing Costs Capitalization Criteria (IAS 23)

Borrowing costs directly attributable to the acquisition, construction, or production of a 'qualifying asset' (an asset that necessarily takes a substantial period of time to get ready for its intended use or sale) must ...

ACCA Examiner Tips & Common Pitfalls

In ACCA SBR examinations, questions testing Property, Plant & Equipment and Borrowing Costs require candidates to look beyond rote definitions and demonstrate applied critical reasoning. Common student pitfalls include confusing legal form with economic substance, omitting mandatory disclosure steps, and failing to justify calculations with standard references.

Topic Mastery Checklist

  • Master core definitions and scope boundaries for Property, Plant & Equipment and Borrowing Costs
  • Memorize key computational workings, journal entries, or audit test procedures
  • Be able to critique real-world scenarios against relevant professional standards
  • Practice time-pressured CBE questions under 1.8 minutes per mark

Practice questions

Authentic CBE practice questions — work through them step-by-step or view the complete bank.

10 Practice Questions
Question 1of 10
Single choice · 2 marks

An entity constructed a nuclear power plant costing £100m. Environmental legislation mandates that at the end of its 40-year useful life, the plant must be decommissioned and the site restored at an estimated future cash cost of £80m. The present value of this obligation discounted at 5% is £11.36m. How should this decommissioning obligation be initially recognized?

Show answer and explanation

Answer: Add £11.36m to the carrying amount of the power plant PPE and recognize an IAS 37 provision of £11.36m, depreciating the total over 40 years

Under IAS 16 para 16(c) and IAS 37, the initial estimate of dismantling and site restoration costs must be included in the cost of PPE and recognized as a provision. The asset component is depreciated over 40 years, and the provision is unwound via finance expense.

Common traps: Expensing decommissioning costs upfront or deferring until payment violates IAS 16 capitalisation principles.

Sources: IAS 16 para 16(c); IAS 37 Provisions; ACCA SBR Study Hub Chapter 4

Exam traps for this topic

All SBR exam tips

Flashcards & Key Terms

Active recall with 3D interactive flip deck or full term list.

20 Key Terms & Definitions
Progress
Card 1 of 20
Mastered
0
Mastery
0%

All SBR chapters

  1. 1. Professional Ethics, Public Interest & Social Responsibility
  2. 2. The Conceptual Framework for Financial Reporting
  3. 3. Revenue from Contracts with Customers (IFRS 15)
  4. 4. Property, Plant & Equipment and Borrowing Costs
  5. 5. Intangible Assets & Impairment of Non-Current Assets
  6. 6. Investment Property, Assets Held for Sale & Agriculture
  7. 7. Leases - Lessee & Lessor Accounting (IFRS 16)
  8. 8. Financial Instruments - Classification, Measurement & Derecognition (IFRS 9)
  9. 9. Financial Instruments - Impairment & Hedge Accounting
  10. 10. Employee Benefits - Defined Benefit Plans (IAS 19)
  11. 11. Share-Based Payment Transactions (IFRS 2)
  12. 12. Provisions, Contingencies & Events After Reporting Period
  13. 13. Income Taxes & Deferred Taxation (IAS 12)
  14. 14. Foreign Currency Transactions & Group Translation (IAS 21)
  15. 15. Group Accounting Fundamentals & Business Combinations
  16. 16. Advanced Business Combinations & Step Acquisitions (IFRS 3)
  17. 17. Associates & Joint Arrangements (IAS 28, IFRS 11)
  18. 18. Disposals of Subsidiaries & Loss of Control (IFRS 10)
  19. 19. Consolidated Statement of Cash Flows (IAS 7)
  20. 20. EPS, Operating Segments & Interim Reporting (IAS 33, IFRS 8, IAS 34)
  21. 21. Sustainability Standards & Current Issues (IFRS S1, S2)
  22. 22. Professional & Ethical Responsibilities of the Accountant

Choosing a qualification? CPA vs ACCA 2026